dry dock

美 [ˌdraɪ ˈdɑːk]英 [ˌdraɪ ˈdɒk]
  • n.干船坞

复数: dry docks

dry dockdry dock

noun

C U干船坞
an area in a port from which the water can be removed, used for building or repairing ships

dry dock

频次

  • 1
    N-COUNT 干船坞
    A dry dock is a dock from which water can be removed so that ships or boats can be built or repaired.

noun

1
a large dock from which water can be pumped out;used for building ships or for repairing a ship below its waterline
Synonym: drydock graving dock

数据来源:WordNet

  1. The crew was on the beach while the ship was in dry dock .

    船停泊在干船坞里时水手们都上岸去了。

  2. Application research on numerical simulation of soil nailing wall for dry dock wall

    土钉墙数值模拟在干船坞坞墙中应用探讨

  3. The Door the research on the dry dock gate 's technology design ;

    气控式卧倒坞门工艺设计的研究;

  4. The research on special simulative system of the dry dock gate .

    气控式卧倒坞门专用仿真系统的研究。

  5. The research on optimization of the dry dock gate ;

    气控式卧倒坞门系统动态特性优化分析的研究;

  6. The Calculation for the Design of Flap Gate Cell of Dry Dock

    干船坞卧倒门的舱格设计计算

  7. Discussion on environmental protection technology in dry dock

    干船坞中的环境保护技术探讨

  8. Design and research of the dry dock for immersed tunnel

    大型沉管隧道干坞的设计与研究

  9. Design and Dynamic Simulation of Dry Dock Gate

    干船坞气控式坞门的设计和动态仿真

  10. A new ship was launched from the dry dock .

    一艘新船从乾船坞下水。

  11. The Research of a New Method of Launching by Dry Dock and Floating Dock

    船坞式下水新方案研究

  12. Installation technique for main drainage pump in 300 000 dwt dry dock

    浅谈30万吨级干船坞主排水泵安装工艺

  13. Technical Research To Pre-Cast Immersed Tunnel Elements On Portable Dry Dock

    移动干坞预制沉管隧道管段技术的研究

  14. Construction Technology of Dry Dock of Ningbo Changhong Immersed Tunnel

    宁波常洪隧道干坞施工技术

  15. On Quality Control of Supervision for Pipe Section Bed Treatment in Shanghai Outer mug Tunnel Dry Dock Engineering

    上海市外环隧道干坞工程管段基底处理监理质量控制浅谈

  16. Field Pumping Test and Plan of Pit Dewater of one Myanmar Ship Yard Dry Dock Project

    缅甸某船坞工程现场抽水试验及基坑降水方案

  17. The design of the dry dock gate 's structure is researched , which is discussed detailedly on base of finite element method .

    研究了气控式卧倒坞门的结构设计,详细探讨了利用有限元法进行气控式卧倒坞门的结构设计。

  18. A Successful Butt of Broken Large Floating Dock from Average in 150000t Dry Dock

    大型浮坞海损断体在干坞内的合拢修复

  19. Analysis to difficulties in refitting the ship to be lengthened in dry dock and the plan to solve it

    利用干船坞进行加长船舶改装的难点问题分析与解决方案

  20. In the paper , the uprising-downfall movement characteristics of the dry dock gate are researched by ADAMS .

    利用ADAMS分析研究了气控式卧倒坞门的起卧运动特性,完成了对气控式卧倒坞门系统动态仿真。

  21. The dynamic behavior of pneumatic horizontal dry dock gate [ DK ] 's system is deeply studied to reduce design time and test cost .

    深入了解干船坞气控卧倒门系统的动态特性,以便缩短坞门的设计周期,节约试验费用;

  22. Local leaders have ambitious plans to develop new port facilities and hotels , and to modernise the dry dock .

    当地的领导人也有宏伟的计划,要将此处打造成为一个具有全新港口设施和旅馆的现代化干船坞。

  23. Monitoring and analysis of blasting vibration in blasting demolition of temporary dry dock for a tunnel across the Huangpu River in Shanghai

    上海越江隧道临时干船坞拆除爆破测振与分析

  24. Joint Application of High-Pressure Jet Grouted Piles and Cement Soil Mixed Piles in Anti-seepage of Earth Cofferdam for Dry Dock

    高压喷射注浆和水泥土搅拌桩在干船坞土围堰防渗工程的组合应用

  25. The complex where it was built , which is a dry dock clandestine complex , housed at least 50 people .

    这座建筑建造的地方是一个干燥的码头秘密建筑,能够容纳至少50人。

  26. Zhejiang Province and describes the overall design and the key technical design such as dry dock , pile foundation , element joints and final joint , etc.

    阐述了沉管隧道的总体设计方案,以及干坞工程、管段桩基础、管段接头、最终接头等关键技术方案设计;

  27. Last year the Forbes family motor yacht , the Highlander , was put into dry dock , its crew laid off .

    去年福布斯家族的汉兰达(Highlander)游艇都被拖到了干船坞里,船员也已被辞退。

  28. The 33 × 7.9m tube used in Guangzhou Pearl River Tunnel is prefabricated by movable moulding bed in dry dock site .

    广州珠江隧道的33×7.9m管节,采用整体移动式钢模台车,在干坞中预制。

  29. Royal Caribbean said this week it is looking into building Chinese dry dock facilities and developing logistics centers to supply its ships deployed in the region .

    为向中国政府表明自己计划不断在中国投资,皇家加勒比本周表示,该公司正着眼于在中国建立干船坞和物流中心,以便为自己部署在中国的游轮提供服务。

  30. Construction of the new carrier began in November 2013 , dry dock construction started in March 2015 , and the vessel was launched in April last year .

    这艘新航空母舰于2013年11月开始建造,干船坞2015年3月建造,舰船去年4月正式下水。